Avaya ATM Link Modules and Routing Engines in BN Platforms Instrukcja Użytkownika Strona 27

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 46
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 26
2-1
Chapter 2
Installing ARE Processor Modules
To install an ARE processor module, you must first
1. Remove the front bezel of your BN platform.
2. Remove the electromagnetic compatibility (EMC) shield from the front panel
to access the interior.
3. Choose a slot.
4. Remove the board retainer bracket (BLN and BLN-2 only).
5. Remove the air flow module (unless the slot you want to use already contains
a processor module).
6. Remove a processor module (unless the slot you want to use is does not
already contain a processor module, in which case you must remove the air
flow module).
7. Insert the ARE processor module into your BN platform.
Depending on your BN platform, you need a Phillips or flat-head screwdriver to
complete the steps in this chapter.
The BN hot-swap feature allows you to remove and replace ARE processor
modules with the power on or off.
Danger:
A potential energy hazard exists during hot-swap service of
processor modules. Do not remove more than two adjacent modules without
powering off the BN platform.
Przeglądanie stron 26
1 2 ... 22 23 24 25 26 27 28 29 30 31 32 ... 45 46

Komentarze do niniejszej Instrukcji

Brak uwag