144 BCM 5.0 media bay modules testing
Nortel Business Communications Manager 5.0
Configuration — System
NN40170-501 02.04 Standard
September 2009
Copyright © 2009, Nortel Networks
If the Power LED is off, check that the power supply cable is properly seated
in the expansion unit and the power supply is connected to a working power
outlet.
2 Check that the MBM is properly seated in the expansion unit.
If the Status LED is not solid green, check that the Expansion cable is
properly seated in the Expansion port on the expansion unit and on the main
unit.
3 Check that the MBM and expansion unit are enabled using either Business
Element Manager or Telset Administration.
If the units are enabled, disable them, and then re-enable them.
4 Check that all the switches on the MBM are on.
5 If the MBM is a GASM or GATM, all the switches on the right are not set to
on.
To check the MBM switches, you must remove the MBM from the expansion
unit.
--End--